8319 Chancellor Row

Stabilized and revitalized a structurally compromised building through foundation reconstruction, slab remediation, and a full office redesign tailored for long-term operational growth.

8319 Chancellor Row presented significant structural and functional challenges at the time of acquisition. The building had underlying issues that impacted both its integrity and usability, requiring a comprehensive, multi-disciplinary approach to restore and future-proof the asset.

Structural Stabilization

One of the primary concerns was an exterior load-bearing wall that had experienced lateral displacement due to foundation failure. The wall was effectively separating from the structure, posing a serious structural risk.

- Conducted coordinated assessments with structural engineers
- Excavated and exposed the existing foundation system
- Installed a new reinforced foundation designed to current standards
- Mechanically tied the existing wall back into the new foundation system
- Eliminated further movement and restored full structural stability

Slab & Ground Remediation

The building also suffered from significant slab settlement caused by subgrade instability.

- Identified compromised soil conditions beneath the slab
- Undertook a full cut-and-remove of affected sections
- Rebuilt the sub-base using properly compacted engineered fill
- Installed a new slab designed for long-term durability and load performance

This approach ensured the issue was not just patched, but permanently corrected.

Office Design & Build

Beyond structural repairs, the project included a complete redesign and construction of a new office space tailored to the client’s operations.

- Worked closely with ownership to understand workflow and team requirements
- Designed a layout optimized for efficiency, communication, and scalability
- Delivered a modern office environment built to support future growth